This Planning Commission meeting will be televised on local Pacific Coast Television PCT/Pacifica Channel 26. PCT also links their program calendar, and recent coastside civic meeting videos. The City website will also livestream this meeting. Complying with the Coronavirus (COVID-19) Disease Notice (fully detailed on page 1 of the Planning Commission PDF link below): this civic meeting will not be physically open to the public, and will be held by through teleconferencing.
Public comments, see pages 1 and 2 of the pdf agenda below. 1) Live access is available through Zoom and dial-in: during the public comment period, press 9 to raise your hand; when called upon, provide the last 4 digits of your phone number. Or, 2) comments for the record only prior to 4 pm date of the meeting may be submitted to publiccomment@ci.pacifica.ca.us. 1) In the subject line be sure to specify whether oral communications or an Agenda item and the number, 2) in the text include your full name, 3) limit your text to no more than 350 words.
Interactive Planning Commission Agenda, 8/3/20. Planning Commission Agenda, 8/3/20, pdf pages 209.
Item 1. Vista Mar Project (4 duplex townhouses) |
Designation
of liaison to
City Council
meeting, 8/24/20: Single-family residence, Lots 4-12 Oddstad Way. Consent
items, none.
Consideration
items, none.
Public oral communications (through Zoom and phone).
Continued Public hearings
1. File 2002-01. PSD-714-02, UP-904-02, Tentative SUB-204-02; authorizations for heritage tree removal and logging operations 7 heritage trees and 50 non-heritage trees): Construction of "Vista Mar Project": four new townhouse duplex buildings (two dwelling units each), and associated subdivision for condominium purposes. The undeveloped lot is 53,000 sf (1.217 acres). located 250 feet south-east side of Monterey Road and Hickey Boulevard intersection (APN 009-381-010), Westview/Pacific Highlands, report. a) Resolution and COAs (draft). b) Land use/zoning. c) Project plans (received 07-27-2020). d) Project renderings. e) Driveway corner sight distance analysis. f) a not used link. IS/MND: g) Responses to comments. h) Errata. i) Mitigation monitoring and reporting program. j) Arborist report. k) Public Comment.
Communications: Planning Commission, Staff. Adjourn.
-------------------
Public oral communications (through Zoom and phone).
Continued Public hearings
1. File 2002-01. PSD-714-02, UP-904-02, Tentative SUB-204-02; authorizations for heritage tree removal and logging operations 7 heritage trees and 50 non-heritage trees): Construction of "Vista Mar Project": four new townhouse duplex buildings (two dwelling units each), and associated subdivision for condominium purposes. The undeveloped lot is 53,000 sf (1.217 acres). located 250 feet south-east side of Monterey Road and Hickey Boulevard intersection (APN 009-381-010), Westview/Pacific Highlands, report. a) Resolution and COAs (draft). b) Land use/zoning. c) Project plans (received 07-27-2020). d) Project renderings. e) Driveway corner sight distance analysis. f) a not used link. IS/MND: g) Responses to comments. h) Errata. i) Mitigation monitoring and reporting program. j) Arborist report. k) Public Comment.
Communications: Planning Commission, Staff. Adjourn.
-------------------
Related
Vista Mar Project. City of Pacifica District News/Public Review, 1/13/20 - 2/13/20.. CA.Gov CEQA, review 1/13/20 -2/11/20. Older: See Pacifica
Riptide,"Vistamar development proposed on Monterey
Road", 11/5/15, links to 1) initial City Press Release/Request for Proposals, 11/6/15; 2) Vistamar Townhomes website, 3) Title report, updated/amended 5/30/14. Note graphic from the Pacifica Riptide posting, see the Vistamar website for more.
--------------------
Reference, Planning acronyms highlighted as used in today's meeting. ADU, Accessory dwelling unit. APN, Assessor's parcel number. CCC, CA Coastal Commission. CDP, Coastal Development permit. COAs, conditions of approval. CPUC, California Public Utilities Commission. CZ, (Coastal Zone Combining) zoning districts. DA, development agreement. DP, development permit. ECR, Existing Conditions Report. ESHA, environmentally sensitive habitat areas. GPA, General Plan Amendment. HDR, high density residential. IP, implementation plan. IS, initial study. JADU, Junior accessory dwelling unit. LCP, Local Coastal Program. LDR, low density residential. LLC, limited liability company. LUP, Land Use Plan. MDR, medium density residential. PD, Planned Development. PDA, Priority Development Area. PE, Parking Exception. PSD, Site Development permit. PUE. Public utilities easment. PV, Permit Variance. RIA, Rent Increase Application. RZ, rezoning. S, Sign permit. SE, Sign Exception. SF or sf, square foot. SP, Specific Plan. SUB, Subdivision. TA, text amendment (ordinance). TBD, to be determined. TDR, transfer of development rights (urban planning). TUP, Temporary use permit. UP, Use permit. CA code, accessory (second residential) dwelling units, 65852.2. WCF, Wireless communication facility. Zoning: California Environmental Quality Act (CEQA). CA CEQA: Guidelines (Adoption of Coastal Plans and Programs), Article 19, Categorical Exemptions: Section 15265, CEQA does not apply to activities and approvals pursuant to the CA Coastal Act, but shall apply to certification of a local coastal program by the CCC. Class 1 categorical exemptions: existing facilities, section 15301; no significant effect section 15061 (b)(3); not a project, a review, section 15378, see (b)(4); Class 2, section 15302. Class 3. Class 4, section 14394, minor alterations to land. B-5, lot size overlay. Freestanding single-family residences set-back and parking, C-1, neighborhood commercial. C-2, Commercial/Office (within 100 ft. of a residential zone). C-3, Service Commercial. Class 3 categorical exemption, section 15303. Class 32, Infill Development projects, section 15332. IS/MND, Initial study/mitigated negative declaration. LCLUP, Local Coastal Land Use Plan. MND, Mitigated negative declaration. MMRP, Mitigation monitoring and reporting program. MOD, modification of subdivision regulations. Cannabis/Marijuana: CAP, Cannabis Activity Permit. CMO, Cannabis Manufacturing Operation. CO-RB, Cannabis Operation, Rockaway Beach Overlay District. CO-SP, Cannabis Operation, Sharp Park Overlay District. CPSL, Cannabis Public Safety License. CRO, Cannabis retail operation. MPSLs, Marijuana public safety licenses. MO-RB, Marijuana operation-Rockaway Beach Overlay District. MO-SP, Marijuana operation, Sharp Park overlay district. MRO, Marijuana retail operation. MUPs, Marijuana Use Permits and related zoning. City: APR, annual progress report. GPA, General Plan amendment. LCLUP, Local Coastal Land Use Plan, updated documents. CIP, capital improvement program, Title/Ordinances/Municipal Code. GP, General Plan, update documents, background history. PMC, Pacifica Municipal Code. R, residential. R1, single-family residential, Reference.com. R1H, single-family residential hillside. R-2, two-family residential; R-3, multi-family residential; R-3G, multiple-family residential garden district. RIA, rent increase application. S, City of Pacifica Sign ordinance. SPSP, Sharp Park Specific Plan. VLDR, Vary low density residential. Zoning/Planning Handouts, City of Pacifica.
Posted by Kathy Meeh
2 comments:
How are the democrats marxist revolution going???
I don't know. How are your beginning English classes going?
Post a Comment